Weatherford and Ardyne Technologies Deliver Innovative Casing-Recovery Solution for Fewer POB, Less CO2 Emissions, More Efficiency

Weatherford and Ardyne Technologies collaboratively developed and executed an innovative casing-recovery solution combining Ardyne's cutting and jacking tools with Weatherford's QuickCut™ casing-exit and AccuView® real-time monitoring systems, enabling the safe cutting and recovery of 9 5/8-in. casing over 1,640 ft in a single trip despite annulus gas risks, reducing personnel on board, CO2 emissions, and enhancing operational efficiency.

Performance By The Numbers

Weatherford and Ardyne Technologies: Innovative Casing-Recovery Solution

Objectives

  • Cut and recover 9 5/8-in. casing to the surface to enable setting a 13 3/8‑in. whipstock for a casing exit. A high likelihood of gas in the annulus made an innovative solution necessary before jacking free and recovering the casing from the well.

Our Approach

  • Weatherford and Ardyne collaborated to create a unique casing-recovery solution using leading technologies from both companies. The solution included casing-cutting and jacking technology from Ardyne, as well as the shallow-angle QuickCut™ casing-exit system and AccuView® real-time remote support system from Weatherford.
  • Due to potential gas in the annulus, Ardyne proposed running its DownHole Power Tool (DHPT) and FRM Spear with a packoff to allow circulation on the backside. This was the first time this combination of Ardyne tools was run in the bottomhole assembly (BHA).
  • Both companies cross-trained one crew member from the other service provider on its technology, enabling the same highly competent, multiskilled personnel on board (POB) to execute the entire project.
  • First, Ardyne and then Weatherford deployed their respective technologies.
  • After circulating the annulus without seeing gas at the surface, personnel jacked free three sections of approximately 1,640 ft (500 m) of casing. The solution enabled completing circulation and jacking in a single trip.
    • Section 1: 35 activations, 2,611 psi (180 bar), 346,000 kg (346 tonnes) force to free.
    • Section 2: 32 activations, 3,481 psi (240 bar), 458,000 kg (458 tonnes) force to free.
    • Section 3: 85 activations, 4,496 psi (310 bar), 594,000 kg (594 tonnes) force to free.
  • The QuickCut system was set at a depth of 9,524 ft (2,903 m), providing a high-quality window. The AccuView system enabled real-time remote onshore monitoring.

Value to Customer

  • The collaboration resulted in an innovative solution with world-class technologies, delivering the casing exit in a single trip.
  • Compared to conventional methods, the solution reduced POB by 2 crew members, saved 27 hours of rig time (a 29% efficiency improvement), and reduced CO2 emissions by 47,000 kg (47 tonnes).

Project Details

  • Location: Norway
  • Well Type: Offshore, oil
  • Casing Size and Type: 9-5/8 in.
  • Depth of Whipstock: 9,524 ft (2,903 m)

Project Efficiencies

  • 27 hours saved
  • 54 MWh saved
  • 4,755 gallons (18,000 L) of diesel saved
  • 47,000 kg (47 tonnes) of CO2 emissions reduced

Products/Services Used

Weatherford:

  • Shallow-angle QuickCut casing-exit system
  • AccuView real-time remote support system

Ardyne:

  • DownHole Power Tool (DHPT)
  • FRM Spear