Integrated Well Construction Solutions

Weatherford provides integrated well construction solutions combining pre-planning, tailored execution, proprietary risk mitigation, and advanced automated technologies like Centro™, Victus™, and Vero® to deliver wells earlier, improve drilling efficiency by up to 62%, reduce costs by 40%, and increase production by 32%, while ensuring safety and long-term well integrity across oil, gas, geothermal, and other resource projects.

Integrated Well Construction Solutions

Deliver Wells Earlier

Weatherford offers well construction solutions for cost-effective, reliable execution to achieve your long-term integrity and production goals. The process begins with pre-planning strategies to fully understand objectives and risks, whether for oil and gas, geothermal, or other resources requiring wells for access. In collaboration with all stakeholders, Weatherford tailors purpose-built solutions and effective execution plans to mitigate risks, accomplish objectives, and facilitate early production. Drawing on proven experience for consistent, predictable results across the entire project delivery spectrum—from time and materials, to lump-sum turnkey, engineering and well-design expertise, operational planning, and third-party management—Weatherford integrates services to optimize total cost of ownership and deliver wells earlier.

Performance Highlights

  • 21 days saved in an HPHT well with tailored solutions (North Sea)
  • 61% drilling time improvement (Oman)
  • 62% faster well delivery, 40% less cost, and 32% more production (Mexico)

Advance Overall Efficiency and Mitigate Risk

Using a project management methodology, Weatherford carries out all facets of the strategy for increased drilling and completion efficiencies while upholding the highest safety and well integrity standards. The method includes a proprietary drilling hazard mitigation process for risk management, continuous improvement, and effective integration of Weatherford and third-party services to attain dependable well construction performance.

Engineering experts design wells and plan operations while leveraging a broad technology and service offering. This portfolio features exclusive automated and digital solutions, including:

  • Centro™ well construction optimization platform
  • Victus™ intelligent MPD
  • Vero® automated connection integrity

These technologies are applied to proactively handle well construction challenges, manage wellbore conditions with precision, and establish unquestionable well integrity to meet project objectives.

Case Studies

Mexico

40 days of early production and counting in an integrated shallow-water operation

Since 2017, Weatherford has performed integrated drilling, completion, and workover services in a new offshore project in the Gulf of Mexico. Drilling in 24 wells was reduced by more than 40 days, saving $6 million and resulting in early production. Additionally, 105 workovers were executed, resulting in more than 73,000 B/D of production.

North Sea

21 days ahead of AFE with a goal-oriented solution and performance-based contract

Driven by KPIs including safety, operational objectives, and timeline targets, Weatherford transitioned to a performance-based contract, enabling better alignment with the operator and focus on achieving the operator’s goals.

Mexico

35% faster completion delivery, 50% more oil production than expected in a shale well

The Weatherford Integrated Services team developed and executed a design-to-delivery completion program that complied with new, rigorous government regulations. Lessons learned from unconventional completion operations in the Continental US and South America resulted in faster delivery and more production in the uncharted onshore area.

Read more

Argentina

$1.5 million in rig time saved in HPHT campaign with 4 unconventional wells

In the Vaca Muerta and Quintuco formations, Weatherford deployed an integrated solution, including the Revolution® rotary steerable system, Victus intelligent managed pressure drilling, and Vero automated connection integrity. This saved an operator more than 6 days of drilling time worth nearly $1.5 million, enabling safe drilling through challenging intervals in record time with zero nonproductive time caused by formation instability, influxes, or mud losses.

Read more

Achieve Consistent and Predictable Results

Weatherford develops innovative solutions that incorporate effective designs and execution plans, with the project manager acting as a single point of contact to manage every activity and ensure open, clear communication among all project stakeholders.

The Centro well construction optimization platform supports collaboration, enabling operations to be carried out according to plan and variables to be managed proactively for reliable, consistent delivery. From design to planning and implementation, executional integrity is monitored remotely, onsite, or both. This operational supervision helps achieve and maintain safety and quality, stay on-time and on-budget, manage change, secure lessons learned, capture best practices, and implement newfound knowledge for continuous improvement during the life of the project and in future operations.

Additional Case Studies

Oman

540+ drilled wells, 5,580+ interventions, and more in ongoing 11-year project

For 11 years, Weatherford has performed integrated drilling and intervention services for a major operator. So far, 542 wells have been drilled, more than 5,580 workover and intervention jobs performed, and over 340 artificial lift systems installed. Services have optimized drilling performance, shaving 196 days from the original schedule for a savings of $16 million.

Mexico

42 days saved with fast delivery of deviated onshore well using remote capabilities

A Weatherford solution—including Integrated Services and the Centro well construction optimization platform—enabled delivery of an onshore well in 60% less time with 40% less cost and 33% more production compared to the previous offset well. The software platform provided end-to-end real-time data technology with access for more than 100 users as well as remote monitoring and optimization by several product lines.

Read more

North Sea

6-week MPD installation helps to deliver complex wells ahead of plan in HPHT campaign

Weatherford MPD experts designed, fabricated, and permanently installed a Victus intelligent MPD solution with a reduced footprint on a drilling contractor’s jackup rig in just 41 days. The early installation enabled the rig to depart the shipyard on schedule, after which the solution provided precise, fast pressure control when drilling through challenging high-pressure, high-temperature formations to reach total depth.

Read more

Colombia

Zero HSE issues, <3% NPT as presence re-established in country after more than 20 years

For all phases of an exploratory project in an area with high potential for recovering unconventional resources, Weatherford provided integrated logistical and operational services. The customer completed the job in 291 days with less than 3% NPT and within budget, re-establishing its presence in an unfamiliar country with a unique social and political environment.

Read more

Discover How You Can Deliver Wells Earlier

Share your well construction challenges with Weatherford to discuss integrated drilling and completions solutions tailored to your needs for executing with reliability, building wellbores of quality, and delivering wells ahead of time.